Laboratories
Electrical Machines Lab
Carpet area 330 sq.m (11 x 30). Major equipment: DC rectifier, 230 V / 32 A. Total investment till date: Rs. 25,94,867.
Electrical Measurement Lab
Carpet area 195.5 sq.m (8.5 x 23). Total investment till date: Rs. 1,79,152.
High Voltage Lab
Carpet area 56 sq.m (7 x 8). Major equipment: 100 kV high-voltage cascade transformer unit. Total investment till date: Rs. 5,43,658.
Micro Controller Lab
Carpet area 35.75 sq.m (5.5 x 6.5). Major equipment: 8051 microcontroller kits. Total investment till date: Rs. 8,59,354.
Analog and Digital Electronics Lab
Carpet area 48.25 sq.m (7.5 x 6.5). Major equipment: digital CRO and power packs.
Digital Signal Processing Lab
Carpet area 29.75 sq.m (8.5 x 3.5). Major equipment: Yokogawa digital oscilloscope DL9140 (1 GHz bandwidth, 4 channels). Total investment till date: Rs. 13,28,920.
Power Electronics & Control System Simulation Lab
Carpet area 45.5 sq.m (6.5 x 7).
FPGA Lab (TEQIP-II)
FPGA-based power electronics laboratory. Total investment till date: Rs. 21,36,000.
Power Systems Lab
Carpet area 19.25 sq.m (5.5 x 3.5). Total investment till date: Rs. 11,87,531.
Computer Lab
Carpet area 29.75 sq.m (8.5 x 3.5). Total investment till date: Rs. 18,66,529.
AutoCAD Laboratory
Carpet area 29.75 sq.m (8.5 x 3.5).
Seminar Hall
Carpet area 65 sq.m (10 x 6.5). Facilities: LCD projector with screen.
Software Licenses
Departmental software licenses. Total investment till date: Rs. 25,78,120.
SCADA Lab (TEQIP)
Carpet area 175 sq.m. Major equipment: wind electrical generator with controller and accessories (Model UE-15, 1.5 kW / 24 V). Total investment till date: Rs. 40,00,000.
Energy Lab (TEQIP)
Carpet area 175 sq.m. Total investment till date: Rs. 27,70,000. Total laboratory investment across the department: Rs. 2,00,44,131.
UG Classrooms & Department Seminar Hall
Room 107 (105 sq.m) with smart board and lecture-capturing facility; Room 206 (105 sq.m) with LCD display; Department Seminar Hall (65 sq.m) with LCD display.
Faculty Rooms & Department Office
Nine faculty rooms - Rooms 1 to 8 at 115 sq.m each and Room 9 at 84 sq.m, with personal PCs and internet; EE department office (Room 10) at 126 sq.m.
Computing Facilities (UG)
48 computers in total; 21 UG computer terminals (terminal-to-student ratio 1:4) with dual-core-and-above hardware; 45 terminals on LAN/WAN with 1 Gbps network connectivity; licensed Windows 10, MATLAB (networked), AutoCAD Electrical 2006 and MS Office; internet speed scaled by intake from 16 Mbps to 64 Mbps.









